WSL-adjusted ERCOT Four Coincident Peak risk monitor for C&I load curtailment decisions
gridkit_ercot_4cp_monitorOpen the Gridleaf portal with this dataset or prompt ready, then continue the same context in Claude.
Real-time ERCOT 4CP risk monitoring for Texas commercial and industrial electricity customers. Estimates settlement-basis coincident peak load by adjusting system load for wholesale storage load (WSL), compares against monthly and critical thresholds, and surfaces curtailment windows, risk drivers, and TCOS savings exposure. Built for data centers, manufacturers, refineries, miners, universities, and demand-response teams that need a natural-language 4CP control room inside Gridleaf, Claude, or ChatGPT.
| Name | Type | Required | Description |
|---|---|---|---|
| include_forecast | boolean | optional (true) | Include ERCOT load forecast context |
| custom_threshold_mw | float | optional | Optional company-specific curtailment trigger in MW |
Part of the unified Gridleaf gateway. Connect once for all 58 tools:
claude mcp add --transport streamable-http gridleaf https://mcp.gridleaf.org/mcp --header "X-API-Key: YOUR_KEY"Settings > Integrations > Add Custom Connector > URL: https://mcp.gridleaf.org/mcp
Real-time CAISO day-ahead and real-time wholesale electricity prices
ERCOT settlement point price screen for hubs, congestion, and intraday market shape
Total load curve across the California grid in MW
Real-time CAISO solar and wind generation — the actual duck curve