Gridleaf data discovery

Energy datasets you can ask questions about.

A Gridstatus-style catalog with an AI analytics layer on top: start with ERCOT 4CP, LMP prices, historical market data, site diligence, and queue context, then continue the same prompt in the Gridleaf portal, Claude, or ChatGPT.

Natural language router

Find the right energy dataset.

Ask best matchDataset page

ERCOT 4CP Monitor

High match / 28 signal

4CP risk scoreEstimated CP loadHeadroom MW

ERCOT Settlement Prices

Explore match / 2 signal

Hub priceCongestion componentIntraday spread

Historical LMP Analytics

Explore match / 2 signal

Average LMPVolatilityNegative-price frequency
Analysis playbooks

Launch a full Gridleaf workflow.

Playbooks package the dataset, analytic steps, portal prompt, and Claude or ChatGPT handoff into one reusable workflow.

gridkit_ercot_4cp_monitor
Natural language query

Ask a dataset

Compose once, then run the prompt in Gridleaf or copy it into Claude or ChatGPT with the dataset context attached.

gridkit_ercot_4cp_monitor

Visual target

Risk gauge + interval bars

Sources

ERCOT load forecastERCOT storage/WSLGridleaf 4CP model

Query inputs

query_contract
Claude setup

Portal handoff

Open

Gridleaf dataset: ERCOT 4CP Monitor Tool: gridkit_ercot_4cp_monitor Sources: ERCOT load forecast, ERCOT storage/WSL, Gridleaf 4CP model Source readiness: Market-day monitoring / Operations screening Query contract: - Title: 4CP curtailment query contract - Primary entity: ERCOT load zone or facility - Time grain: 15-minute intervals - Visualization mode: Risk gauge + interval bars - Inputs: operating_date (date, required) e.g. today; site_or_zone (string, required) e.g. Houston data center; interval_load_mw (number, optional) e.g. 18 MW; curtailment_mw (number, optional) e.g. 4 MW - Example queries: Monitor 4CP risk for a Houston data center today with 18 MW load.; Which ERCOT intervals should I curtail if I can shed 4 MW? Analysis plan contract: - Version: gridleaf-analysis-plan.v2 - Dataset: ERCOT 4CP Monitor (ercot-4cp) - Tool: gridkit_ercot_4cp_monitor - Workflow: ERCOT 4CP Monitor baseline analysis - Output: Risk gauge + interval bars - Result preview: 4CP risk window result (4CP risk score) - Query contract: 4CP curtailment query contract (15-minute intervals) - Metrics: 4CP risk score, Estimated CP load, Headroom MW, Curtailment value - Sources: ERCOT load forecast, ERCOT storage/WSL, Gridleaf 4CP model - Source readiness: Market-day monitoring (Operations screening) - Source caveats: ERCOT settlement and WSL inputs can revise after the operating day.; Account exposure remains model-assisted until interval load and tariff data are attached. - Source next actions: Refresh source status before issuing a curtailment instruction.; Confirm facility interval load before treating modeled value as billing-grade. - Steps: Route the natural-language question to the right Gridleaf dataset. -> Run or prepare the matching Gridleaf portal tool with source-status caveats. -> Return a decision-ready answer and the next Claude or ChatGPT prompt. Result preview contract: - Title: 4CP risk window result - Chart: Interval risk - Primary metric: 4CP risk score - Fields: interval, risk_score, headroom_mw, curtailment_value_usd_per_mw - Example rows: 15:00 CT: 81 risk ($5.2k/MW); 16:00 CT: 94 risk ($7.8k/MW); 17:00 CT: 73 risk ($4.1k/MW) Dataset insight packet: - Version: gridleaf-dataset-insight.v1 - Contract key: dataset_insight - Dataset: ERCOT 4CP Monitor (ercot-4cp) - Tool: gridkit_ercot_4cp_monitor - Workflow: ERCOT 4CP Monitor baseline analysis - Visualization: Risk gauge + interval bars - Fields: interval, risk_score, headroom_mw, curtailment_value_usd_per_mw - Rows: 15:00 CT: 81 risk ($5.2k/MW); 16:00 CT: 94 risk ($7.8k/MW); 17:00 CT: 73 risk ($4.1k/MW) - Source readiness: Market-day monitoring (Operations screening) - Next queries: Monitor 4CP risk for a Houston data center today with 18 MW load.; Which ERCOT intervals should I curtail if I can shed 4 MW?; Should I curtail a Texas facility this afternoon?; Which intervals are most likely to become a 4CP event? Monitor ERCOT 4CP risk for a Houston data center today. Show peak-risk windows, WSL adjustment, curtailment value, and what I should ask Claude to analyze next. Return a concise analytical memo, call out source freshness and caveats, and suggest the next Gridleaf portal query. User question: Monitor 4CP risk for a Houston data center today with 18 MW load. query_contract: 4CP curtailment query contract Primary entity: ERCOT load zone or facility Time grain: 15-minute intervals Query inputs: - operating_date: today (required) - site_or_zone: Houston data center (required) - interval_load_mw: 18 MW (optional) - curtailment_mw: 4 MW (optional) Required inputs covered by provided values or contract examples. Return Risk gauge + interval bars with source_status_policy caveats, result_preview fields, and the next Gridleaf portal or Claude follow-up.

Gridleaf answer preview

Gridleaf will route this ask to gridkit_ercot_4cp_monitor and return Risk gauge + interval bars for today.

answer_preview

Primary result

15:00 CT: 81 risk / $5.2k/MW

Visual

Interval risk

Source

Market-day monitoring

Preview rows

15:00 CT

1.8 GW headroom

81 risk

$5.2k/MW

16:00 CT

0.9 GW headroom

94 risk

$7.8k/MW

17:00 CT

2.4 GW headroom

73 risk

$4.1k/MW

Answer notes

Expected output fields: interval, risk_score, headroom_mw, curtailment_value_usd_per_mw.

Source readiness: Market-day monitoring (Operations screening).

ERCOT settlement and WSL inputs can revise after the operating day.

AI handoff package

Copy a provider-ready package with source readiness, analysis steps, and the Gridleaf return URL.

Provider

Claude

Source readiness

Market-day monitoring

Return

Gridleaf portal

Return to Gridleaf

External AI return

Bring the Claude or ChatGPT answer back with the external_ai_return contract and source checks.

Featured datasets

Each dataset has a portal prompt, an MCP tool, source context, and a visualization target.

Real-time market

ERCOT 4CP Monitor

WSL-adjusted coincident-peak risk, curtailment window, and TCOS exposure for ERCOT C&I loads.

Interval risk
Market-day monitoring
14:00
15:00
16:00
17:00
18:00

Result preview

4CP risk score

4CP risk window result

Ranked interval risk, WSL-adjusted system load context, and account-level curtailment economics.

15:00 CT

1.8 GW headroom

81 risk

$5.2k/MW

16:00 CT

0.9 GW headroom

94 risk

$7.8k/MW

Query contract

15-minute intervals

Ask for market-day 4CP risk with a site, operating date, interval load, and optional curtailment amount.

Operating date

operating_date

Required

today

Site or zone

site_or_zone

Required

Houston data center

Interval load

interval_load_mw

Optional

18 MW

Source readiness

fresh

Freshness

Market-day monitoring

Decision grade

Operations screening

ERCOT settlement and WSL inputs can revise after the operating day.

4CP risk scoreEstimated CP loadHeadroom MWCurtailment value
Real-time market

ERCOT Settlement Prices

Settlement point price screen for ERCOT hubs, congestion, and intraday price shape.

Hub price
Near real-time market screen
Houston
North
West
South
Load

Result preview

Hub price

ERCOT hub price result

Hub cards, congestion component, intraday shape, and basis signal for ERCOT market memos.

HB Houston

$2.80 congestion

$38.70/MWh

Moderate basis

HB North

$1.10 congestion

$35.20/MWh

Light basis

Query contract

Current or intraday interval

Ask for settlement point prices with hub or load-zone filters, price interval, and congestion/basis context.

Settlement point

settlement_point

Required

HB_HOUSTON

Price interval

price_interval

Optional

current interval

Comparison points

comparison_points

Optional

HB_NORTH, HB_WEST

Source readiness

fresh

Freshness

Near real-time market screen

Decision grade

Trading screen

Settlement point prices can revise after ERCOT settlement updates.

Hub priceCongestion componentIntraday spreadBasis signal
Historical market

Historical LMP Analytics

Hourly LMP history across US ISOs for basis, BESS, capture-rate, and revenue analysis.

Annual average
Historical analytics store
2021
2022
2023
2024
2025

Result preview

Average LMP

Historical LMP study result

Time-series slice with volatility, negative-price frequency, and storage spread setup.

CAISO SP15

21% volatility

$42.10/MWh

6.4% negative

ERCOT Houston

18% volatility

$38.70/MWh

3.2% negative

Query contract

Hourly source, daily/monthly aggregates

Ask for ISO, node, date range, aggregation, and storage or basis-analysis context.

Market

market

Required

CAISO

Node or hub

node

Required

SP15

Date range

date_range

Required

2021-2025

Source readiness

historical

Freshness

Historical hourly store

Decision grade

Backtest setup

Historical LMP is not a live dispatch or trading signal.

Average LMPVolatilityNegative-price frequencyBESS spread
Site diligence

Solar Site Analysis

Parcel, environmental, permitting, buildable-area, and interconnection screening with saved map context.

Constraint severity
On-demand site screen
Parcel
Buildable
Wetland
FEMA
Setback

Result preview

Buildable acres

Site diligence result

Constraint map, buildable-area estimate, source caveats, and saved map context for follow-up analysis.

Parcel

APNs attached

25.5 acres

Map saved

Wetlands

NWI screen

Layer check

Verify docs

Query contract

On-demand layer snapshot

Ask with coordinates, address, APNs, acreage, and target asset type for map-backed constraint screening.

Location

location

Required

37.7199, -121.3065

APNs

apns

Optional

23927012, 23927013

Acreage

acreage

Optional

25.5 acres

Source readiness

mixed

Freshness

On-demand layer check

Decision grade

Diligence screening

Parcel and environmental layers are screening-grade until source documents are reviewed.

Buildable acresConstraint severityInterconnection proximitySource status
Grid access

Interconnection Queue Context

Nearby queue volume, ISO/RTO congestion signal, and project mix for site feasibility conversations.

Queue MW mix
On-demand queue context
Solar
Storage
Hybrid
Load
Other

Result preview

Queue MW

Queue context result

Nearby project mix, queue MW, congestion signal, and feasibility questions for grid access.

Solar

9 projects

640 MW

Crowded

Storage

7 projects

520 MW

Watch

Query contract

Latest queue snapshot

Ask with location, ISO/RTO, radius, technology filters, and congestion or project-mix focus.

Location

location

Required

near Lubbock, TX

Market

market

Optional

ERCOT

Radius

radius_miles

Optional

25 miles

Source readiness

mixed

Freshness

On-demand queue context

Decision grade

Feasibility screening

ISO/RTO queues can lag withdrawal and milestone changes.

Queue MWProject countCongestion signalTechnology mix