PJM Transmissionfree

PJM Data Center Feasibility

Comprehensive feasibility score (0-100) with 10+ parallel analyses and interactive map

MCP Function Name
gridkit_pjm_datacenter_feasibility

What It Does

The gold standard for PJM data center siting. Runs 10+ analyses in parallel: PJM FCITC, FEMA flood, wetlands, streams, protected areas, terrain, soil, species habitat, solar resource, carbon intensity, parcel lookup, buildable area. Returns composite score (0-100) and interactive Leaflet map.

Parameters

NameTypeRequiredDescription
latfloatoptionalLatitude
lonfloatoptionalLongitude
addressstringoptionalUS street address
requested_mwfloatoptional (100)Requested MW load

Try These in Claude

Is this PJM location feasible for a 100MW data center?

Data Sources

PJM FCITCFEMA NFHLNWINHDPAD-USUSGS 3DEPSSURGOUSFWSNREL PVWattsEPA eGRIDLightBox RE

Use Cases

Connect This Tool

Part of the unified Gridleaf gateway. Connect once for all 55 tools:

Claude Code
claude mcp add --transport streamable-http gridleaf https://mcp.gridleaf.org/mcp --header "X-API-Key: YOUR_KEY"
Claude.ai

Settings > Integrations > Add Custom Connector > URL: https://mcp.gridleaf.org/mcp

More PJM Transmission Tools