Buildable acres after all exclusions with MW AC capacity estimate
gridleaf_buildable_area_v2Enhanced buildable area analysis that runs full constraint subtraction (flood zones, drainage, setbacks, ESA habitat, Significant Ecological Areas) and returns net buildable acres, MW AC capacity estimate at three confidence levels (conservative/central/aggressive), and an interconnect sanity check against nearby substations.
| Name | Type | Required | Description |
|---|---|---|---|
| lat | float | optional | Latitude |
| lon | float | optional | Longitude |
| address | string | optional | US street address |
| parcel_acres | float | optional (100) | Parcel size in acres |
| proposed_mw_dc | float | optional | Proposed DC capacity |
Part of the unified Gridleaf gateway. Connect once for all 56 tools:
claude mcp add --transport streamable-http gridleaf https://mcp.gridleaf.org/mcp --header "X-API-Key: YOUR_KEY"Settings > Integrations > Add Custom Connector > URL: https://mcp.gridleaf.org/mcp
13-layer constraint analysis with interactive Google Maps and GO/NO-GO verdict
Natural gas, CNG, LNG, and gas-fired power site assessment — 15 HIFLD + EIA gas layers, environmental screen, power grid, interactive Google Maps
Full environmental screening with downloadable PDF report and satellite imagery
Interactive Leaflet map with 12+ toggleable constraint layers